Overview
Our engineers detected a bearing fault on an input shaft to the thruster.
The bearing was deteriorating over time, and it was recommended that it should be replaced during a scheduled port call. The cost of replacing in-situ bearing compared to overhauling the thruster unit equated to savings of £295,000.
GulfMark tasked us with rolling out a Condition Based Maintenance (CBM) programme throughout their fleet with the goal of improving their maintenance strategy and reducing maintenance costs.
The challenge
The solution
The result
Our engineers detected deterioration in the first support bearing on the input shaft to the thruster.
The thruster was monitored over a period of time to determine the rate of deterioration.
The rate of change detected indicated that the bearing needed to be replaced.
The bearing replacement and general inspection was completed during a port call with minimal interruption to the vessel’s operations.
Upon inspection the poor condition of the input bearing was confirmed – see figure 1.
Figure 1: First support bearing from the input shaft on the thruster.